Miro G pulled off Lit-et-Mixe beach at first attempt and headed for Le Verdon
Abeille Bretagne had the 28,200 dwt bulk carrier afloat 40 minutes after the pull began

The Malta-flagged bulk carrier Miro G is afloat again after four days on the beach at Lit-et-Mixe in south-west France. The tug Abeille Bretagne pulled her clear on the afternoon of Tuesday 24 November, at the first attempt, the Atlantic maritime prefecture announced.
Tugs mobilised by the port of Bordeaux are to take the ship to Le Verdon, at the mouth of the Gironde, where divers will inspect the hull. An initial survey had found no damage to the 169-metre ship. A French Navy Falcon 50 flew over the grounding site and the route of the tow and found no pollution.
How was Miro G refloated?
Salvors were flown aboard by helicopter on Tuesday and used a generator that had been airlifted to the ship to run the ballast pumps. Ballast had been taken on after the grounding to keep the ship stable in the surf, and it had to be pumped out again to reduce her draught. Jet skis and a rescue boat helped to connect a 1,900-metre synthetic towline, made up of 250-metre sections, to the tug, which could not come close to the shore.
The line came tight at around 1500 local time, about an hour before high water. Miro G began to move, was back in the water within some 15 minutes and was floating 40 minutes after the pull began. Fishing boats with anti-pollution equipment stood by close to the coast.
The tide was as much as a metre higher than when the ship went ashore, but that window would have closed on Thursday 26 November. The authorities had said that the ship might have to be dismantled on the beach if she could not be pulled off.
The Greek-owned ship of 28,200 dwt, built in 2011, had discharged in Spain and was sailing empty to Rouen when she reported difficulty manoeuvring on the evening of 19 November. Her anchors dragged in gusts of 48 knots and waves of four to six metres, and she was driven ashore that night. Helicopters lifted off 19 of the 22 crew members; the master and two others were taken off later, when the weather worsened again.
This story is part of the Maritime Briefing of 25 November 2026.


